Skip to content
Serving Palm Beach and Broward, South Florida
Mon to Fri 8:00 AM to 6:00 PM, 24/7 emergency line 954-798-5143
All services
Industrial service

Control Panels and PLC Programming

Your control panel is the brain of the machine, and a clean, correctly built panel is the difference between reliable production and constant callbacks. Ogun Factory Automation builds fully wired control cabinets and PLC and relay based panels that are laid out for reliability, safety, and easy service. Whether you need a new panel built or an existing one repaired and cleaned up, we make the wiring make sense.

Control Panels and PLC Programming by Ogun Factory Automation
Scope

What this service includes

Full control cabinet assembly with organized wire routing, labeling, and terminal blocks
PLC based and relay based control logic wiring for automated equipment
Integration of contactors, starters, overloads, and protective devices
Operator controls, pilot lights, selector switches, and emergency stop stations
Panel rework and cleanup on cabinets that have been patched over the years
Testing and functional checkout before the panel goes into service
Symptoms

Problems we fix

A panel that overheats, trips, or has loose and undersized wiring
Disorganized, unlabeled wiring that makes every repair slow and risky
A relay panel you want upgraded to more reliable modern control
Burned contacts, failed relays, or intermittent faults inside the cabinet
A new machine or process that needs a control panel designed and built for it
How it works

Straightforward, from call to fix

1
Call

Reach out and tell us what is happening with your equipment. We listen, ask the right questions, and set up a visit that fits your production schedule.

2
Diagnose

We come out and find the real cause across electrical, controls, and mechanical systems using proper testing, then explain clearly what failed and what it will take to fix.

3
Fix and follow up

We complete the repair or installation, test it before we leave, and check back to make sure your equipment is running the way it should.

Go deeper

Guides and local pages for control panels and plc programming

Questions

Frequently asked

Can you build a panel offsite and install it later?+

Yes. Building the panel in advance and installing it during a planned window is often the fastest way to add or replace a control panel with minimal disruption to your operation.

Do you label and document the panels you build?+

We label wiring and terminals and lay panels out for serviceability, so the next person who opens the cabinet can understand it quickly. That saves you time and money on every future repair.

My panel works but the wiring is a mess. Is that worth fixing?+

Often yes. Disorganized wiring hides problems, slows down troubleshooting, and raises the risk of faults. A cleanup and re-terminate can pay for itself in reduced downtime.

Safe and accountable

De-energize and lock out first

OSHA 10-Hour Construction Outreach trained and insured. Certificate of Insurance available on request.

We de-energize and lock out first, then verify absence of voltage before we work
OSHA 10-Hour Construction Outreach trained; PPE matched to each task
Emergency-stop and safety circuits built and tested to code
Platforms and brands we work with
DeltaYaskawaVictronABBWEGEatonLenze

Need control panels and plc programming?

Serving Palm Beach and Broward counties, including Greenacres, West Palm Beach, Lake Worth, Boynton Beach, Boca Raton, Fort Lauderdale.